D&R List

This is the Work-in-Progress Decorating and Renovating List! It will be nice to see everything crossed off, but the house projects will always be an ongoing adventure :)

Living Room

  • Rewire the entire room. The previous owners really messed up the 3-way wiring (Completed 3/20/10)
  • Paint walls (Completed 4/8/10)
  • Paint trim (Completed 4/8/10)
  • Find curtains (Completed 2/12/10)
  • Purchase new couch/chair
  • Build two of these. (I’ve looked all over for side tables that look like this, but no luck, so hubby and I will build our own!)
  • hang picture wall
  • Purchase an Area Rug
  • Figure out storage for laptops
  • Assemble seasonal decorations (A work in progress for the year!)
  • Finish crocheting blanket for couch
  • Purchase plant stand
  • Build this. (I’m thinking this would make a fantastic little liqueur cabinet until we build the bar in the basement!)
  • Dining Room/Kitchen

  • Paint the main color (Completed 5/24/10)
  • Paint accent color ( Completed 6/20/10)
  • Hang wine rack (completed 6/12/10)
  • Find chair cushions
  • Remove bedroom doorway and drywall
  • Paint counter tops
  • Replace light fixture
  • Replace flooring
  • Assemble seasonal centerpieces
  • Purchase new dining room table
  • Purchase curtains (completed 5/10/10)
  • Find/hang art
  • Replace cabinet hardware
  • Paint cabinets
  • Install display shelf for cooking mags/cookbooks
  • Build this.
  • Office

  • Paint
  • Purchase/make curtains
  • Organize books
  • Install shelving
  • Set up a “his and hers” balance
  • Bathroom

  • Replace tub
  • Replace floor
  • Re-stain vanity
  • Replace lights
  • Organize closet
  • Install towel rack
  • Install shelf over toilet
  • Paint
  • Purchase window treatments
  • Replace cabinet hardware
  • Spare Bedroom

  • Find bedding for daybed (Completed 6/21/10)
  • Re-finish side table (Completed 6/21/10)
  • Paint
  • Organize bookshelf
  • Paint bookshelf
  • Repaint dressers (Completed 6/21/10)
  • Hang art
  • Hang curtains
  • Purchase lamp
  • Master Bedroom

  • Re-insulate
  • Drywall
  • Purchase new bed
  • Refinish or replace existing dressers
  • Paint
  • Replace flooring
  • Refinish vanity
  • Relocate door
  • Purchase new bedside tables
  • Purchase window treatments
  • Outside

  • Replace roof
  • Establish front of the house flower bed
  • Take down front yard tree
  • Establish garden in back yard ( Completed 6/5/10)
  • Put in a backyard patio
  • Basement

  • Sand/stain steps to basement
  • Refinish entire basement
  • Wall off laundry room
  • Finish second bathroom
  • Build bar
  • Clean out root cellars
  • Seasonal Decor

  • Christmas Card Basket
  • Summer centerpiece for coffee table
  • Christmas blanket
  • Christmas throw pillows
  • Halloween throw pillows
  • Leave a Reply

    Your email address will not be published. Required fields are marked *

    *

    You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>


    9 × eight =